References
In this section you will find a selection of our projects, with photographs and descriptions.
You can search by selecting one or more of the following criteria: geographical macro area, typology of project, geographical area (state, region or province).
MACRO AREA
- Italy
- Foreign countries
TYPOLOGY
- Major projects
- Marina and mooring points
- River and lake landings
- Floating piers
- Floating breakwaters
- Floating platforms
- Fixed piers and docks
- Floating bridges
- Water sport centres
- Slipways
- Special structures
- Plant
AREA
- Italy
- Foreign countries
Tourist port with capacity of 320 for boats up to 25 m, consisting of floating pontons and piers anchored with steel piles drived into the tuff rock. Quay paved with tropical timber, the same as on the floating structures. Double terminal pump out system.
Full optional pump out station type CV150SN with isolated shell, sewage suction terminal model Alfa.
Full optional pump out station, aluminium frame structure with plexiglas shell, sewage suction terminal, oil suction terminal, oil tank and bilge water oil separator.
Floating harbour on the Temo river with floating pier dimensions m 180x4.70, free board 80 cm, overload 400 kg/m² for the protection of the floating harbour and for the mooring with fingers of boats up to 14 metres length. Floating platfom dimensions 20x19m. Anchoring system with piles and sliding devices. Full optional pump out station, aluminium frame structure with plexiglas shell, sewage suction terminal, oil suction terminal and oil tank.
Full optional pump out station, aluminium frame structure with plexiglas shell, sewage suction terminal, oil suction terminal and oil tank.
floating harbour with 616 metres of pontoons, 288 metres of floating breakwaters, width 3.00 m. Full optional pump out station, aluminium frame structure with plexiglas shell, sewage suction terminal, oil suction terminal and oil tank.
Floating infrastructures with floating pier dimensions m 57.5x5, free board 50 cm, overload 170 kg/m² for the separation of the port into two basins for the mooring of boats up to 20 metres in length. Anchoring system with chains and deadweights. Pump out station, sewage and oil suction tank.
