In this section you will find a selection of our projects, with photographs and descriptions.
You can search by selecting one or more of the following criteria: geographical macro area, typology of project, geographical area (state, region or province).
Government Landings
2022 - Duqm
Government Landings
2022 - Duqm
Landings for Royal Omani Police and Sultan’s Special Force
Sheltering floating breakwaters for Cala dei Sardi
2021 - Cala dei Sardi, Sardinia, Italy (SS)
Sheltering floating breakwaters for Cala dei Sardi
2021 - Cala dei Sardi, Sardinia, Italy (SS)
14no. sheltering floating breakwaters with dimension 20x6m, manufactured on site.
Kopraina Harbour
2021 - Kopraina, Greece
Kopraina Harbour
2021 - Kopraina, Greece
9no. reinforced steel frame pontoons with concrete floaters, completed with access gangway and mooring system.
Assonautica Trieste
2021 - Trieste, Italy (TS)
Assonautica Trieste
2021 - Trieste, Italy (TS)
Floating pontoons anchored by special vertical beams.
Scuola Grande della Misericordia
2021 - Venice, Italy (VE)
Scuola Grande della Misericordia
2021 - Venice, Italy (VE)
Floating landing composed of a fixed balcony, hinged gangway and floating pontoon anchored with piles. The supply includes pile guide devices, safty ladder and parapet.
Maintenance of public transport landing
2021 - Venice, Italy (VE)
Maintenance of public transport landing
2021 - Venice, Italy (VE)
Maintenance of landing for public transport in Venice.
Landing for pleasure boats
2021 - Porto Tolle, RO, Italy (RO)
Landing for pleasure boats
2021 - Porto Tolle, RO, Italy (RO)
Landing for the development of sustainable tourism, composed of a floating landing with dimensions 15x4m and a 13m long access gangway.
Bay Marina - Dubai Harbour
2020 - Dubai, UAE
Bay Marina - Dubai Harbour
2020 - Dubai, UAE
More than 14000m2 of all concrete floating pontoons, fingers, platforms. Prestigious marina with up to 6m wide pontoons and up to 60m long fingers, berths for up to 130m long vessels.
Floating and fixed landings for leisure boats
2020 - La Maddalena (SS)
Floating and fixed landings for leisure boats
2020 - La Maddalena (SS)
Floating and fixed landing for leisure boats, with length from 6m up to 12m, including access system with portal and service bollards.
Marghera Fort access floating crossing
2020 - Venice (VE)
Marghera Fort access floating crossing
2020 - Venice (VE)
2.5m wide floating pedestrian access to Marghera Fort near Venice. Parapets are equipped with handrail and stainless steel net for safety of the users.
Landing for local police
2020 - Venice, Italy (VE)
Landing for local police
2020 - Venice, Italy (VE)
Floating pontoons and fingers sheltered by 12x3m brakwaters, anchored with piles, for local police mooring.
Landing for coastguard
2020 - Pirano, Slovenia
Landing for coastguard
2020 - Pirano, Slovenia
Reinforced hot dip galvanised steel pontoons and aluminium access gangways with shaped ground plate.
Relaunching of Cala Balbiano Port
2020 - La Maddalena, Sardinia, Italy (SS)
Relaunching of Cala Balbiano Port
2020 - La Maddalena, Sardinia, Italy (SS)
Supply and installation of 6no. floating breakwaters with dim. 20x6m (freeboard 0.8m) and 1no. floating pier 20x6m for the relaunching of the tourist and commercial activity of Cala Balbiano harbour. The connection of the floating modules is through various types of walkways with portal.
Renovation of Buggerru Harbour
2020 - Buggerru, Sardinia, Italy (CI)
Renovation of Buggerru Harbour
2020 - Buggerru, Sardinia, Italy (CI)
Two piers for total length of 108m, composed of floating pontoons in hot di galvianised and painted steel, the landing is completed by 2no. access gangways.
Rowing platforms
2020 - Albano Lake, Rome, Italy (RM)
Rowing platforms
2020 - Albano Lake, Rome, Italy (RM)
Turn-key installation od two rowing platforms 15x4.20m and access systems.
Turist Harbour
2020 - Viareggio (LU)
Turist Harbour
2020 - Viareggio (LU)
Construction and installation of a new fixed pier, refurbishment of floating pontoons and installation of new anchoring system for the external piers
Landing for touristic boats
2019 - Venice (VE)
Landing for touristic boats
2019 - Venice (VE)
Very robust and stable foating landing 12x4.2m with 90cm freeboard, equipped with mooring blisters anchored with piles, near Calatrava Bridge.
Pedestrian floating bridge
2019 - Venice (VE)
Pedestrian floating bridge
2019 - Venice (VE)
Floating crossing for temporary connection of Venice with the cimitery of San Michele, in occasion of All Saints event. Length 400m, width 10m. The same, relocated, was part of the circuit during the 37th Venice Marathon.
Japanese Garden Marina
2019 - Aqaba, Jordan
Japanese Garden Marina
2019 - Aqaba, Jordan
Small harbour for ricreative boats, composed of 3m wide floating pontoons and 10m long fingers; in addition a side mooring pontoon together with berths for jet-ski complete the supply.
Service pontoons for Ventimiglia new port
2019 - Ventimiglia, Imperia (IM)
Service pontoons for Ventimiglia new port
2019 - Ventimiglia, Imperia (IM)
Supply and installation of 380m floating service pontoons made with aluminium frame and FSC tropical hardwood decking, supported by concrete floaters. Pontoons are anchored with vertical beams to the quay.
Water access for Bank of Italy
2019 - Venice (VE)
Water access for Bank of Italy
2019 - Venice (VE)
Special floating pontoon with side wooden cover, equipped with landing gangway hinged to the pontoon.
Landing for yacht tenders
2019 - Antigua & Barbuda
Landing for yacht tenders
2019 - Antigua & Barbuda
2.35m piers anchored with chains, for yacht tenders mooring.
Assonautica di Genova
2019 - Genoa, Italy (GE)
Assonautica di Genova
2019 - Genoa, Italy (GE)
Rowing pontoon (30cm freeboard) anchored with vertical beams to the quay, and accessible through a floating gangway laying/rolling on a concrete slipway.
Carrara Port
2019 - Carrara (MS)
Carrara Port
2019 - Carrara (MS)
50m floating breakwater 4m wide, having the aim of berthing small-medium boats and sheltering them from the wave action generated by manouvring ships in the port.
Pontoon for Astir Palace Resort
2019 - Vouliagmeni, Greece
Pontoon for Astir Palace Resort
2019 - Vouliagmeni, Greece
All concrete floating element with tropical hardwood decking and access gangway 5x1.20m.
Landing renewal
2019 - La Maddalena, Italy (SS)
Landing renewal
2019 - La Maddalena, Italy (SS)
Replacement of 2no. floating pontoons in La Maddalena.
Chioggia Coastguard
2019 - Chioggia,Italy (VE)
Chioggia Coastguard
2019 - Chioggia,Italy (VE)
Supply and installation of floating landing for Coastguard vessels, anchored with piles, equipped with floating access system.
Seasonal landing
2019 - Bacoli, Naples (NA)
Seasonal landing
2019 - Bacoli, Naples (NA)
Floating pontoons with robust side profiles supported by rotomoulded polyethylene floaters.
Port Duqm
2019 - Duqm, Oman
Port Duqm
2019 - Duqm, Oman
6m wide floating breakwaters for fishery dhow and skiff boats mooring. The landing is accessible thanks to 22m long gangways, designed to bear 500kg/m2.
River landing for houseboats
2019 - Jesolo, Venice (VE)
River landing for houseboats
2019 - Jesolo, Venice (VE)
Public river landing for houseboats with fixed access sistem and gangway..
Port de Pianottoli
2018 - Pianottoli Caldarello - Corsica
Port de Pianottoli
2018 - Pianottoli Caldarello - Corsica
Supply of floating breakwater elements of dim.12x3m for a pier 48m long.
Lustica Bay marine
Lustica, Montenegro
Lustica Bay marine
Lustica, Montenegro
2018 - King size 3m wide floating pier with floating access gangway and accessories for the new marina.
2019 - New 3m wide 96m long floating pier for boat mooring.
Hilton watertaxi landing
2018 - Venice (VE)
Hilton watertaxi landing
2018 - Venice (VE)
Floating pontoon for watertaxi mooring at Hilton hotel in Venice
Floating pontoon for Marcegaglia Hotels&Resort
2018 - Albarella island (RO)
Floating pontoon for Marcegaglia Hotels&Resort
2018 - Albarella island (RO)
T shape floatin pier for turistic and sports boats
Società Canottieri Timavo
2018 - Monfalcone (GO)
Società Canottieri Timavo
2018 - Monfalcone (GO)
Additional floating elements to increase the number of berths
Baita al Lago
2018 - Castelfranco Veneto (TV)
Baita al Lago
2018 - Castelfranco Veneto (TV)
240sqm sunbathing floating platform with swimmingpool and floating connection to the beach of a private lake
Floating platform for Weiss Café
2018 - Sacile (PN)
Floating platform for Weiss Café
2018 - Sacile (PN)
River floating platform 12x3m with glass panel parapets for leisure and relax
Fixed pier with FRP grating panel deck
2018 - Aqaba, Jordan
Fixed pier with FRP grating panel deck
2018 - Aqaba, Jordan
57m long fixed pier supported by driven piles, composed of a 2.5m wide robust hot dip galvanised and painted steel frame with FRP grating panel deck .
Landing for Senigallia Port
2018 - Senigallia, Italy (AN)
Landing for Senigallia Port
2018 - Senigallia, Italy (AN)
Landing for 24m long boats: robust floating pontoons anchored to the quay with vertical beams and access system composed of balcony and gangaway.
Touristic landing for Dobrota Palazzi villas
2018 - Kotor, Montenegro
Touristic landing for Dobrota Palazzi villas
2018 - Kotor, Montenegro
2.5m wide floating pontoon anchored with chains and concrete blocks, with 5m long access gangway.
River landing for houseboats
2018 - Lignano Sabbiadoro (UD)
River landing for houseboats
2018 - Lignano Sabbiadoro (UD)
River landing for houseboat mooring, composed of 260m floating pontoons and round platform.
Morinj Marina
2018 - Morinj, Montenegro
Morinj Marina
2018 - Morinj, Montenegro
45m of 2.5m wide floating pontoons and 5m long access gangway, for boats up to 15m.
Landing for hydroambulances
2018 - Venice (VE)
Landing for hydroambulances
2018 - Venice (VE)
Special 75m freeboard floating pontoon, equipped with mooring blisters and floating gangway with parapeths.
Redevelopment of Molo Pagliari: a new marina with 890no berths
2018 - La Spezia (SP)
Redevelopment of Molo Pagliari: a new marina with 890no berths
2018 - La Spezia (SP)
New harbour shelterd by 240m + 180m of monolotic elements of floating breakwaters with dimension 20x8m (150t) and 20x10m (180t). Inside, 1200m of all concrete floating pontoons, 2.4m wide, with tropical hardwood decking, are installed for boat berthing of local nautical centers.
Landing in Venice lagoon
2018 - Mazzorbo, Venice (VE)
Landing in Venice lagoon
2018 - Mazzorbo, Venice (VE)
Floating elements with continuous flotation, 2.5m wide, with 12m long finger for boat berthing.
Landing for fuel station
2018 - Chioggia, Italy (VE)
Landing for fuel station
2018 - Chioggia, Italy (VE)
Service landing for fuel station, anchored with piles.
Capo d'Orlando marina
2017 - Capo d'Orlando (ME)
Capo d'Orlando marina
2017 - Capo d'Orlando (ME)
Marina able to accommodate 562 boats from 7.5 to 40m in length. Layout consisting of two floating piers made of monolithic concrete elements 5m wide and discontinuous floating elements 2.5m wide with steel frame and tropical wooden decking for a total development of 850m.
Associazione Sportiva Dilettantistica Diportisti Morin
2017 - La Spezia (SP)
Associazione Sportiva Dilettantistica Diportisti Morin
2017 - La Spezia (SP)
Supply and installation of new floating pontoons and services for the yachtsmen of the city
Porto Vecchio Marine
2017 - Sant'Amanza, Bonifacio - Corsica
Porto Vecchio Marine
2017 - Sant'Amanza, Bonifacio - Corsica
Supply of 240m of all concrete floating pontoons. Elements of dimensions 20x4m with displacement of 40tons.
Floating harbour for Venetian waterbuses
2017 - Tronchetto - Venice (VE)
Floating harbour for Venetian waterbuses
2017 - Tronchetto - Venice (VE)
Protection of a floating harbour with 600m of floating breakwater for ACTV (Venetian public waterbuses). New modules of dimensions 20x3m, 2.05m high and 75cm freeboard.
Police landing
2017 - Venetian Arsenal (VE)
Police landing
2017 - Venetian Arsenal (VE)
Floating landing for police vessels inside the Venetian Arsenal
Landing and floating walkway for lake of Resia
2017 - Curon Venosta (TN)
Landing and floating walkway for lake of Resia
2017 - Curon Venosta (TN)
Floating bridge and landing
Public floating walkay
2017 - Lake of Revine (TV)
Public floating walkay
2017 - Lake of Revine (TV)
Public floating walkway to complete the paths around the lake
Marina Valletta
La Valletta
Marina Valletta
La Valletta
2017 - Supply of floating pontoons 3m wide for the new 270 berths from 10m up to 28m long foresee in the new marina.
2018 - Additional 180m of floating pontoons along the rocky quay, anchored with rods.
Mitan Marina
2017 - Muroskva bay at Novi Vinodolski
Mitan Marina
2017 - Muroskva bay at Novi Vinodolski
A floating pier anchored by vertical beams to the quay and compelted with mooring fingers
Port de Bonifacio
2017 - Sant'Amanza, Bonifacio - Corsica
Port de Bonifacio
2017 - Sant'Amanza, Bonifacio - Corsica
Supply of reinforced floating pontoons 2.35m wide made of steel, concrete and wood. The piers, located in the gulf of Sant'Amanza are managed by Port of Bonifacio
Floating pontoon for fire fighting vessels
2017 - Genoa (GE)
Floating pontoon for fire fighting vessels
2017 - Genoa (GE)
King size floating pier 3m wide, with a special access gangway structure, for fire fighting motor vessels of Port of Genoa
Nautical center at Maggiore Lake
2017 - Locarno
Nautical center at Maggiore Lake
2017 - Locarno
1no. 20x3m and 2no. 20x4m floating breakwaters anchored with piles and dampening pile guides for sheltering of the nautical center. 2no. 12m long
fingers optimise additional berths.
Marina d'Arechi Port Village
2016 - Salerno (SA)
Marina d'Arechi Port Village
2016 - Salerno (SA)
Supply of 43 all cocncrete floating pontoons of dimensions 12x3m with WPC (Wood Palstic Composite) decking to complete the Santiago Calatrava project for berths up to 36m long,The marina todayhas nearly 1000 berths over a surface area of about 340.000sm.
Gruppo Antonini SpA
2016 - La Spezia (SP)
Gruppo Antonini SpA
2016 - La Spezia (SP)
King size floating pontoons 3m wide at the shipyard of Gruppo Antonini SpA
Landing for turistic vessels
2016 - Tronchetto - Venice (VE)
Landing for turistic vessels
2016 - Tronchetto - Venice (VE)
Fixed structure and floating elements with differents freeboard for watertaxi and turistic vessels
Landings for Venice airport
2016 - Venice (VE)
Landings for Venice airport
2016 - Venice (VE)
Special floating landings for watertaxi and waterbuses connecting the airport to the city of Venice
Port of Portoroz
2016 - Portoroz
Port of Portoroz
2016 - Portoroz
Supply of a floating breakwater pier 72m long in elements of dim.12x3m and two floating piers 60m longs in all-concrete elements of dimension 12x2.5m
Riva Shipyard
2016 - Sarnico (BG)
Riva Shipyard
2016 - Sarnico (BG)
Special floating pontoon for mooring yachts of the shipyard
Small boat landing
2016 - Punat - Krk Island
Small boat landing
2016 - Punat - Krk Island
Floating landing for small boats
Marina Novi Vinodolski
2016 - Novi Vinodolski
Marina Novi Vinodolski
2016 - Novi Vinodolski
Supply of 4no. floating piers for 180 new berths. The floating pontoons are anchored by chains and concrtere blocks and the boats are moored by med mooring system
Alto Adriatico Shipyard
2016 - Monfalcone (GO)
Alto Adriatico Shipyard
2016 - Monfalcone (GO)
Flaoting basin for Mega Yachts obtained with 72m of floating pontoon anchored by vertical beams to the quay and two floating piers 40m long anchored with piles.
Rowing platform
2015 - Rome (RM)
Rowing platform
2015 - Rome (RM)
Floating platform of dimensions 16x5m on the river Tiber for Circolo Canottieri Lazio
Marina at Sabah Al-Ahmad Sea City
2015 - Al Khiran, Kuwait
Marina at Sabah Al-Ahmad Sea City
2015 - Al Khiran, Kuwait
6 km of all-concrete finger and pontoons, anchored with over 300 steel piles, creating 400 berths for boats up to 40m
Water taxi landing
2015 - Tessera (VE)
Water taxi landing
2015 - Tessera (VE)
N°8 floating landings for the Venetian water taxi at the Marco Polo Airport
"Laguna San Giorgio" Yachting Club
2015 - Porto Nogaro (UD)
"Laguna San Giorgio" Yachting Club
2015 - Porto Nogaro (UD)
Landig for water craft made with fixed an floating piers.
Floating landings
2015 - Sacca Sessola Island (VE)
Floating landings
2015 - Sacca Sessola Island (VE)
Service and guest landing for Marriott Venice Resort on the Rose's Island in the Venetian lagoon.
Floating landig
2015 - Venice (VE)
Floating landig
2015 - Venice (VE)
Water taxi stop on S.Michele island.
Border Guard landings
Kingdom of Saudi Arabia
Border Guard landings
Kingdom of Saudi Arabia
Since 2014, supply of different landings across Saudi Arabia shores for the border guard, with various characteristics: breakwaters; aluminium and hot dip galvanised painted steel pontoons; rotomoulded and concrete floaters; rods, piles and chains anchoring.
Portoroz Marina
2015 - Portoroz
Portoroz Marina
2015 - Portoroz
Supply of floating pontoons for little boats
Yachting landing
2014 - Savona (SV)
Yachting landing
2014 - Savona (SV)
New floating pontoons 2,35m wide for LNI yachts.
Opening floating crossing
2014 - Livorno (LI)
Opening floating crossing
2014 - Livorno (LI)
Electro-mechanical floating crossing over the Livorno channel between the Fortezza Vecchia and the city center.
Portopiccolo
2014 - Sistiana (TS)
Portopiccolo
2014 - Sistiana (TS)
A modern marina with 120 berths for yachts from 8m up to 32m moored to 500m of floating pontoons 2,5m and 3m wide. The pontoons are anchored with driven piles and the boats moor along the fingers. A large floating platform acts as focal point of the marina a giving access to the largest berths.
Mooring floating pontoon
2014 - Golfo Aranci (OT)
Mooring floating pontoon
2014 - Golfo Aranci (OT)
50m of floating pontoons made with heavy duty hot dip galvanized frames and concrete floaters
Water ambulance landing
2014 - Chioggia (VE)
Water ambulance landing
2014 - Chioggia (VE)
Floating landing at Chioggia hospital
Approdo Montecarlo
2014 - Sottomarina di Chioggia (VE)
Approdo Montecarlo
2014 - Sottomarina di Chioggia (VE)
Replacement of the existing wooden decking with new floating elements 2,35m wide, complete with water and electrical services. Anchoring system with piles and wooden dolphin mooring for the boats.
Fixed landing
2014 - Portofino (GE)
Fixed landing
2014 - Portofino (GE)
Fixed structure for touristic vessels mooring to the Umberto I pier in Portofino.
Floating landig
2014 - Porto Levante (RO)
Floating landig
2014 - Porto Levante (RO)
Floating landing for Italian Finance Police in the mouth of river Po.
Special Mooring structures
2014 - Bocca di Lido - Treporti (VE)
Special Mooring structures
2014 - Bocca di Lido - Treporti (VE)
Heavy duty pontoons for high-speed catamarans cover routes between Italy and Croatia
Floating landing for service and work vessels
2014 - Al Faw, Iraq
Floating landing for service and work vessels
2014 - Al Faw, Iraq
Floating pontoons in reinforced contrete for the new maritime hub in Arabic Gulf made of 3no. elements with dimensions 20x4x2m, weigh 65t and high freebord of 80cm,
Floating piers for port services
2013 - La Spezia Harbour (SP)
Floating piers for port services
2013 - La Spezia Harbour (SP)
Floating piers dim. 36x5 m with freeboard of 1,2 m for 750 tonnes tug boats mooring.
Border Guard landing
2013 - Venetian Arsenal (VE)
Border Guard landing
2013 - Venetian Arsenal (VE)
Special structures for coast guard landing within the Venice Arsenal.
Turistic Boats landing
2013 - Fezzano (SP)
Turistic Boats landing
2013 - Fezzano (SP)
Floating pier for tourist vessels.
Yachting pontoons
2013 - La Spezia (SP)
Yachting pontoons
2013 - La Spezia (SP)
Seven floating piers for total of 760 ml of floating pontoons for small boats in La Spezia.
Floating breakwater
2013 - San Siro, Lake Como (CO)
Floating breakwater
2013 - San Siro, Lake Como (CO)
Floating barrier made with n°6 modular 12x3 m elements, for protection of new berths.
Yachting landing
2013 - Giardini Naxos (ME)
Yachting landing
2013 - Giardini Naxos (ME)
Reinforced floating pontoons 2.5m wide.
Marina Cala Ponte
2013 - Polignano a Mare (BA)
Marina Cala Ponte
2013 - Polignano a Mare (BA)
Tourist port with capacity of 320 for boats up to 25 m, consisting of floating pontons and piers anchored with steel piles drived into the tuff rock. Quay paved with tropical timber, the same as on the floating structures. Double terminal pump out system.
Marina del Gargano
2013 - Manfredonia (FG)
Marina del Gargano
2013 - Manfredonia (FG)
Tourist port composed of 2250 m of floating pontoos and piers from 1,6 to 4 m wide, all anchored with steel piles. The structures are characterised with 300kg/sqm overload and freeboard between 0,6 and 0,8 m. There are 316 catways up to 1,4 m wide for mooring of the vessels up to 21 m long.
Floating piers for touristic services
2013 - La Spezia Harbour (SP)
Floating piers for touristic services
2013 - La Spezia Harbour (SP)
Floating piers dim. 48x6 m and 1 m freeboard for tourist boats servicing Cinque Terre.
C.N. Adriateam
2012 - Villaggio del pescatore, Duino (TS)
C.N. Adriateam
2012 - Villaggio del pescatore, Duino (TS)
Basin with floating pontoons for mooring vessels on the mouth of the Timavo river.
Flaoting pier for moorings
2012 - Marina Kornati, Croatia
Flaoting pier for moorings
2012 - Marina Kornati, Croatia
Supply of floating pier anchored with rods for to increase the berths numbers.
Floating piers for races
2012 - Naples (NA)
Floating piers for races
2012 - Naples (NA)
Floating piers for America's Cup mach race with the AC45 cathamarans.
Floating piers for races
2012 - Venice (VE)
Floating piers for races
2012 - Venice (VE)
Floating piers for America's Cup mach race with the AC45 cathamarans.
Marina S. Elena
Venice (VE)
Marina S. Elena
Venice (VE)
2012 - 650m of floating pontoons with steel frame, wooden decking and continuos flotation for 150 berth from 9m up to 30m.
2018 - Renewal of the marina with 3m wide floating elements with continuous flotation, 6m long minifingers .
Yachting landing
2012 - Fusina (VE)
Yachting landing
2012 - Fusina (VE)
Floating pontoons anchored with piles for yachts moored with dolphin mooring system.
Floating breakwater
2012 - Gocek Port, Turkey
Floating breakwater
2012 - Gocek Port, Turkey
Floating barrier 280m long and 6m wide to protect a marina with berths up to 70m.
Flaoting landing
2012 - Gravedona (CO)
Flaoting landing
2012 - Gravedona (CO)
Boat landing on lake Como.
Floating structures for nautic event
2012 - The Idroscalo, Milan (MI)
Floating structures for nautic event
2012 - The Idroscalo, Milan (MI)
Multifunctional and flexible floating structure for sport events.
Khiran Marina
2012 - Kiran, Kuwait
Khiran Marina
2012 - Kiran, Kuwait
1500 ml of floating piers 4 m wide and floating pontoons 3 m and 2,5 m wide; 1850 ml of catway from 1 to 2, m wide. All anchored with steel piles.
Yachting landing
2012 - Mali Lošinj, Croatia
Yachting landing
2012 - Mali Lošinj, Croatia
Floating pontoons 2.35m wide.
Cabotage floating structure
2012 - Doha, Kuwait
Cabotage floating structure
2012 - Doha, Kuwait
Special floating platform with 2 m freeboard for 500 tonns vessel mooring.
Little municipality harbour
2012 - Novate Mezzola (SO)
Little municipality harbour
2012 - Novate Mezzola (SO)
Floating pontoons and tailor-made anchoring system for the municipal port on the Mezzola lake.
Yachting pontoons
2012 - Montecarlo, Monaco
Yachting pontoons
2012 - Montecarlo, Monaco
Replacement of old floating pontoons and a platform at Port Hercule. The new elements are all-concrete monolith 2,5 m wide pontoons.
Yachting landing
2012 - Marzamemi (SR)
Yachting landing
2012 - Marzamemi (SR)
Expansion of the mooring facilities for the Nautical Club, with 2,35 m wide floating pontoons.
Marina del Ponte
2012 - Fiumaretta, Magra river (SP)
Marina del Ponte
2012 - Fiumaretta, Magra river (SP)
Floating pontoons at the mouth of the Magra river.
Yachting landing
2012 - Carloforte (CI)
Yachting landing
2012 - Carloforte (CI)
Floating pontoons 2.35m wide.
Ayla Marina
2012 - Aqaba, Jordan
Ayla Marina
2012 - Aqaba, Jordan
7000 square meters of floating pontoons and finger with aluminum alloy frames, concrete floaters and wooden deckings.
Yachting landing
2012 - Le Grazie, Portovenere (SP)
Yachting landing
2012 - Le Grazie, Portovenere (SP)
Vento di Venezia
Isle of Certosa, Venice (VE)
Vento di Venezia
Isle of Certosa, Venice (VE)
Supply from 2006 to 2019 of floating pontoons and floating breakwater for 300 berths from 10 up to 35m lenght for the water hub in Venice lagoon. Mooring system with fingers and dolphin mooring. Floating pontoons anchored with piles.
Yacht club floating center
Ravenna (RA)
Yacht club floating center
Ravenna (RA)
1999 - Surface of about 270 sqm. Free board 75 cm, overload 550 kg/sqm. Anchoring system with piles and sliding devices. Fitting of a floating tank for fresh water accumulation and pre-arrangement for the installation of the office structure.
2012 - Supply of new continous floatation pontoons.
Circolo Vela Torbole
Torbole sul Garda (TN)
Circolo Vela Torbole
Torbole sul Garda (TN)
In 2003 supply of N 5 modules dimensions m 12x3, anchored with chains and deadweights giving protection to 20 berths. The breakwaters are used also for mooring of boats up to 10 metres in length.
In 2012 extention of the floating pontoons supplied in 1994.
Floating platform
2012 - Viareggio (LU)
Floating platform
2012 - Viareggio (LU)
Surface about m² 30.
Historic port of Genoa
Genoa (GE)
Historic port of Genoa
Genoa (GE)
2001 - Tourist redevelopment of the Porto Antico achieved by installation of floating pontoons, gangways and service floating structures.
2012 - Floating structures restyling and extension.
Circolo Barion Sporting Club
2011 - Bari (BA)
Circolo Barion Sporting Club
2011 - Bari (BA)
Floating pontoons harbour.
Nautica Bertelli
2011 - Paratico, Iseo Lake (BS)
Nautica Bertelli
2011 - Paratico, Iseo Lake (BS)
Floating pontoons Harbour with piles anchoring system.
Corte Molin Yachting Club
2011 - Chioggia (VE)
Corte Molin Yachting Club
2011 - Chioggia (VE)
Floating pontoons Harbour with piles anchoring system at mouth of Brenta river.
Darsena Mosella
2011 - Chioggia (VE)
Darsena Mosella
2011 - Chioggia (VE)
Floating pontoons Harbour with piles anchoring system.
Molo Fratelli Bandiera
2011 - Trieste (TS)
Molo Fratelli Bandiera
2011 - Trieste (TS)
Floating pontoons pier with beams anchoring system.
Platform
2011 - Verbania Suna (VB)
Platform
2011 - Verbania Suna (VB)
Floating platform dimensions 6x4m for small lake boats.
Landing for sports
2011 - Mestre (VE)
Landing for sports
2011 - Mestre (VE)
Multifunctional landing for sport activities.
Navy vessel landings
2011 - Shuaiba port, Kuwait
Navy vessel landings
2011 - Shuaiba port, Kuwait
Floating pontoons for U.S.A. navy vessels.
Mirabello Landing
2011 - La Spezia (SP)
Mirabello Landing
2011 - La Spezia (SP)
Marina for local yachtsmen, situated outside Porto Mirabello, made with floating pontoons 3 and 6 m wide and protected by floating breakwaters.
Slipway
2011 - Compagnia della vela, Venice (VE)
Slipway
2011 - Compagnia della vela, Venice (VE)
Slipway for the haulage and launching.
Boat landing
2011 - Goro (FE)
Boat landing
2011 - Goro (FE)
Floating pontoon ancore with piles on the Po river.
Touristic boats landing
2011 - Venice (VE)
Touristic boats landing
2011 - Venice (VE)
Landing for service boats in Venice.
Offshore Marine seasonal landing
2011 - Portovecchio - Corsica
Offshore Marine seasonal landing
2011 - Portovecchio - Corsica
Seasonal landing for recreational yachting in Portovecchio gulf
Floating platform for events
2011 - Adria (RO)
Floating platform for events
2011 - Adria (RO)
Surface about m² 105.
Floating break water basin
2011 - Ranco (VA)
Floating break water basin
2011 - Ranco (VA)
n 9 modules 12x3 anchored with chains.
Porto di San Lorenzo al Mare
2010 - San Lorenzo al Mare (IM)
Porto di San Lorenzo al Mare
2010 - San Lorenzo al Mare (IM)
Floating pontoons harbour.
Cantieri Bellini
2010 - Clusane d’Iseo (BS)
Cantieri Bellini
2010 - Clusane d’Iseo (BS)
Floating breakwater anchored with piles and floating pontoons anchored to the quay with vertical beams.
Marina Dorica
2010 - Ancona (AN)
Marina Dorica
2010 - Ancona (AN)
Floating pontoons anchored with piles and provided of finger till 13,5m length for mooring boats.
Cecar Nautica
2010 - Genoa Airport (GE)
Cecar Nautica
2010 - Genoa Airport (GE)
Floating port with fingers and minifingers near Genoa Airport.
Floating bridge and pontoons
2010 - Venice (VE)
Floating bridge and pontoons
2010 - Venice (VE)
Service vessels harbour in Tronchetto - Venice with floating bridge
Floating walkway
2010 - Savona (SV)
Floating walkway
2010 - Savona (SV)
Floating walkway for restyling of the Port Authority Headquarters.
Refueling floating pontoon
2010 - Marina Dorica, Ancona (AN)
Refueling floating pontoon
2010 - Marina Dorica, Ancona (AN)
Floating pontoon for reflueing.
Fixed quay
2010 - Caorle (VE)
Fixed quay
2010 - Caorle (VE)
Fixed quay realized with pontoons frames with wooden decking for mooring vessels.
Rodos harbour
2010 - Rodos, Greece
Rodos harbour
2010 - Rodos, Greece
Heavy duty aluminium pontoons with fingers.
Port de Stora
2010 - Algeria
Port de Stora
2010 - Algeria
Floating pontoons for fishing boat.
Andalus Marina
2010 - Tripoli, Libya
Andalus Marina
2010 - Tripoli, Libya
Floating piers realized with aluminum floating pontoons.
Yacht club
2010 - Marina di Carrara (MS)
Yacht club
2010 - Marina di Carrara (MS)
240m of floating breakwater 3m and 4m wide, 364m of FE/IG/R H 2,35m wide floating pontoons to obtain up to 300 berths. Anchoring system with chains and concrete mooring blocks.
Porto di Bagnara Calabra
2009 - Bagnara Calabra (RC)
Porto di Bagnara Calabra
2009 - Bagnara Calabra (RC)
Floating port realized with 3 floating piers 44m each for yacht up to 12m. Anchoring system with chains and concrete mooring blocks.
Un P.o.n.t.i.l.e.
2009 - Pontechianale (CN)
Un P.o.n.t.i.l.e.
2009 - Pontechianale (CN)
Floating pier with polyethylene floaters for kayak and windsurf.
Ulisse Cantieri Navali
2009 - Civitavecchia (RM)
Ulisse Cantieri Navali
2009 - Civitavecchia (RM)
New floating pontoons for the historical basin increase the number of yachting berths to 250
Pump out station
2009 - Porto Cesareo (LE)
Pump out station
2009 - Porto Cesareo (LE)
Full optional pump out station type CV150SN with isolated shell, sewage suction terminal model HD.
Private boat landing
2009 - Fiumaretta, Magra river (SP)
Private boat landing
2009 - Fiumaretta, Magra river (SP)
Floating pontoon ancored with piles on Magra river.
Touristic boats landings
2009 - Casale sul Sile (TV)
Touristic boats landings
2009 - Casale sul Sile (TV)
Floating pier 72m lenght for house boats. Anchoring system with piles and sliding devices.
Porto Mirabello
2009 - La Spezia (SP)
Porto Mirabello
2009 - La Spezia (SP)
Fixed piers 3,6 meters wide for the total of 690m of fixed Megayacht piers.
Floating pier
2009 - Le Grazie, Portovenere (SP)
Floating pier
2009 - Le Grazie, Portovenere (SP)
Floating piers, dimensions 36x4.63 meters, free board 75 cm, overload 350 kg/mq for moorin big vassels. Anchoring system with chains and deadweights.
Floating breakwater landing-place
2009 - Sapri (SA)
Floating breakwater landing-place
2009 - Sapri (SA)
n 5 modules 12x3 anchored with chains and deadweight for mooring yacht.
Floating breakwater basin
2009 - Portoferraio, Elba island (LI)
Floating breakwater basin
2009 - Portoferraio, Elba island (LI)
n 3 modules 15x4 anchored with chains and deadweight for mooring yacht.
Floating breakwater landing-place
2009 - Nisida (NA)
Floating breakwater landing-place
2009 - Nisida (NA)
n 10 modules 12x3 anchored with chains and deadweight for mooring yacht.
Santarelli Marine
2009 - Ajaccio, Corsica
Santarelli Marine
2009 - Ajaccio, Corsica
Floating pier for turistc yachts.
Porto Montenegro
2009 - Tivat, Montenegro
Porto Montenegro
2009 - Tivat, Montenegro
Floating harbour realized with floating breakwaters and pontoons.
Jesolo turistic harbour
2009 - Jesolo (VE)
Jesolo turistic harbour
2009 - Jesolo (VE)
Touristic harbour for 650 berths on all-concrete floating pontoons 3m wide. The vessels mooring systme emply catway and dolphin mooring.
Marina slipway
2008 - Marina Hannibal, Monfalcone (GO)
Marina slipway
2008 - Marina Hannibal, Monfalcone (GO)
Slipway dimensions m 15x10 for the haulage and launching of the sailing school boats.
Floating breakwater landing-place
Gallipoli (LE)
Floating breakwater landing-place
Gallipoli (LE)
2008 - n 5 modules dimension 12x3 anchored with chains and deadweight for mooring yacht.
2018 - Additional 2no. floating breakwater elements 12x3m, with mooring accessories and marine lamp.
Floating breakwater landing-place
2008 - Genoa (GE)
Floating breakwater landing-place
2008 - Genoa (GE)
n 3 modules dimension m 20x4 anchored with chains and deadweight for mooring yacht.
Floating breakwater basin
2008 - Taranto (TA)
Floating breakwater basin
2008 - Taranto (TA)
n 25 modules dimension m 12x3 anchored with chains and deadweight for mooring yacht.
Marina di Loano
2008 - Loano (IM)
Marina di Loano
2008 - Loano (IM)
Turn key supply of 1850m of continuous floating pontoon 3m wide with fingers and anchoring piles for berth from 7m to 25m.
Marina Fiorita
2007 - Treporti (VE)
Marina Fiorita
2007 - Treporti (VE)
Floating port realized with 216m of continuous floating pontoon 3m wide and with 136m of discontinuous floating pontoon 2m wide. Anchoring system with piles and mooring system with catway.
Lega Navale Italiana - Sez. di Monfalcone
2007 - Monfalcone (GO)
Lega Navale Italiana - Sez. di Monfalcone
2007 - Monfalcone (GO)
Enlargement of the exixting floating basin.
Marina di Genova Aeroporto
2007 - Sestri Ponente (GE)
Marina di Genova Aeroporto
2007 - Sestri Ponente (GE)
About 500 metri of floating structures for Maxi Yacht. Continuous floating pontoons 3m wide and discontinuous 2,35m wide. Mooring system with catway and ropes.
Pump out station
2007 - Platamonas, Greece
Pump out station
2007 - Platamonas, Greece
Full optional pump out station type CV150SN with isolated shell, sewage suction terminal model Alfa.
Water Bus Stop
2007 - Isle of Certosa, Venice (VE)
Water Bus Stop
2007 - Isle of Certosa, Venice (VE)
Floating link 140 m length and 3 m wide anchoring with piles.
Floating platform for rowing center
2007 - River Tevere (RM)
Floating platform for rowing center
2007 - River Tevere (RM)
Surface about m² 420. Free board 65 cm, overload 400 kg/m². Anchoring system with quay hinges.
Floating platform for offices
2007 - Regional Porto of Locarno, Switzerland
Floating platform for offices
2007 - Regional Porto of Locarno, Switzerland
Surface about m² 235. Free board 65 cm. Anchoring system with piles.
Wood decking for concrete fixed piers
2007 - Arenzano (GE)
Wood decking for concrete fixed piers
2007 - Arenzano (GE)
Wood decking to cover 710 square meters of piers and quay.
Fixed pontoons for megayacht
2007 - Olbia (OT)
Fixed pontoons for megayacht
2007 - Olbia (OT)
Fixed pontoon 5 m width. Fixed pontoon for mooring megayacht up to 60m.
Landing-place for yacht
2007 - Lake Iseo, Sulzano (BS)
Landing-place for yacht
2007 - Lake Iseo, Sulzano (BS)
n 3 modules dimension 12x3 for mooring boats.
Luka Volme
2007 - Premantura, Croatia
Luka Volme
2007 - Premantura, Croatia
270 metres of floating pontoons.
ACI Rab marina
2007 - Rab, Croatia
ACI Rab marina
2007 - Rab, Croatia
270 metres of floating pontoons.
Mina Abdulla
2007 - Kuwait
Mina Abdulla
2007 - Kuwait
Floating special structures for the Coastguard boats.
Marina di Stabia
2006 - Castellammare di Stabia (NA)
Marina di Stabia
2006 - Castellammare di Stabia (NA)
Turn key project with 1605 metres of continuous floating pontoons 3m wide. Reinforced frame, free board 60 cm, overload 360 kg/m². Pontoons anchoring system with steel piles. Boats mooring system with fingers.
Mooring piers
2006 - Salerno (SA)
Mooring piers
2006 - Salerno (SA)
60 metres of pontoons type "King Size" characterized by discountinuous floating elements, width 3 metres. Reinforced frame, free board 75 cm, overload 250 kg/m². Pontoons anchoring system and boats mooring system with chains, deadweights and med moorings.
Fishing harbour
2006 - Marano Lagunare (UD)
Fishing harbour
2006 - Marano Lagunare (UD)
450 metres of discontinuous floating pontoons type "FE/IG/H1", width 2.35 metres. Free board 55 cm, overload 170 kg/m². Pontoons anchoring system with quay beams and sliding devices and steel piles and devices. Boats mooring system with mini-finger and wood piles.
Touristic landing
2006 - Cortellazzo, Jesolo (VE)
Touristic landing
2006 - Cortellazzo, Jesolo (VE)
360 metres of discontinuous floating pontoons type "FE/IG/R-H", width 2.35 metres. Reinforced frame, free board 75 cm, overload 250 kg/m². Pontoons anchoring system with steel piles and sliding devices. Along side boats mooring system.
Cycling-pedestrian crossing
2006 - Vigonovo (VE)
Cycling-pedestrian crossing
2006 - Vigonovo (VE)
The crossing connects the two banks of the water way Padua-Venice. It is a "boat bridge" typology structure with floation units perpendicular to the walkway. Length 58 metres, width 2.4 metres and overload of 400 kg/m². From the crossing there is the access to N 2 side pontoons with lower free board to be used for rowing.
Touristic boats landings
2006 - Punta Sabbioni, Cavallino (VE)
Touristic boats landings
2006 - Punta Sabbioni, Cavallino (VE)
N 2 landings m 12x4.63 for the mooring of boats up to 20 metres in length. Hinged access gangways m 6x1.20. Anchoring system with piles and sliding devices.
Public and private boats landing
2006 - River Po (PV)
Public and private boats landing
2006 - River Po (PV)
N 1 landing m 32x4.63 with defelcting wedge for boats up to 10 metres in length. Hinged access gangways of m 18x1.20. Anchoring system with piles and sliding devices.
Private boats landing
2006 - River Tanaro (AL)
Private boats landing
2006 - River Tanaro (AL)
N 1 landing m 12x2.35 with defelcting wedge for boats up to 12 metres in length. Fixed access gangways of 15x1.20 and hinged gangways from m 13x1.20. Anchoring system with rods and wire ropes.
Marina Cala De' Medici
2006 - Rosignano Solvay (LI)
Marina Cala De' Medici
2006 - Rosignano Solvay (LI)
Fixed quay dimensions m 280x3.50 on steel brackets fixed to the quay. Quay equipped with rubber fender and protection handrail.
Fixed platform and floating landing
2006 - Le Grazie, Portovenere (SP)
Fixed platform and floating landing
2006 - Le Grazie, Portovenere (SP)
Fixed platform on piles for a total surface of 325 square metres.
Installation of two mooring piers in 2008.
Venice Boat Show
2006 - Venice Terminal, Tronchetto (VE)
Venice Boat Show
2006 - Venice Terminal, Tronchetto (VE)
Floating pier dimensions m 630x4.70, free board 75 cm, overload 250 kg/m² for the mooring during the Boat Show, of boats up to 20 metres in length. Anchoring system with piles and sliding devices.
Protection of the fishing landings
2006 - Pennello di Bonaria (CA)
Protection of the fishing landings
2006 - Pennello di Bonaria (CA)
N 3 modules dimensions m 12x3 anchored with chains and deadweights giving protection to 100 metres of quay for fishing moorings.
Split Boat Show
2006 - Split, Croazia
Split Boat Show
2006 - Split, Croazia
N 6 modules dimensions m 20x4 anchored with chains and deadweights giving protection to all in-water exhibition spaces.
ACI Rovinj
2006 - Rovinj, Croatia
ACI Rovinj
2006 - Rovinj, Croatia
450 metres of floating pontoons.
Super-Yacht floating pier
2005 - Molo Dogana, Cagliari (CA)
Super-Yacht floating pier
2005 - Molo Dogana, Cagliari (CA)
120 metres of discountinuous floating pontoons type "King Size", width 3 metres. Reinforced frame, free board 75 cm, overload 250 kg/m². Pontoons anchoring system with quay beams and sliding devices. Boats mooring system with med moorings and deadweights.
Touristic harbour
2005 - Garda lake, Lazise (VR)
Touristic harbour
2005 - Garda lake, Lazise (VR)
300 metres for discontinuous floating pontoons type "FE/ST", width 2.35 metres. Free board 50 cm, overload 110 kg/m². Pontoons anchoring system with steel piles and sliding devices. Boats mooring system with med moorings and deadweights.
Portegrandi Marina
2005 - Portegrandi (VE)
Portegrandi Marina
2005 - Portegrandi (VE)
350 metres of discontinuous floating pontoons type "FE/ST", width 2.35 metres and 65 metres of discountinuous floating pontoons type "FE/ST", width 2 metres. Free board 50 cm, overload 110 kg/m². Pontoons anchoring system with steel piles and sliding devices. Boats mooring system with fingers.
Pump out station
2005 - Alassio (SV)
Pump out station
2005 - Alassio (SV)
Full optional pump out station, aluminium frame structure with plexiglas shell, sewage suction terminal, oil suction terminal, oil tank and bilge water oil separator.
Marina slipway
2005 - Marina di Pescara (PE)
Marina slipway
2005 - Marina di Pescara (PE)
Slipway dimensions m 15x10 for the haulage and launching of the sailing school boats.
Marina slipway
2005 - Muggia (TS)
Marina slipway
2005 - Muggia (TS)
Slipway dimensions m 15x5 for the haulage and launching of the small boats for special events.
Private boats landing
2005 - River Sile (VE)
Private boats landing
2005 - River Sile (VE)
N 1 landing m 12x2.35 for boats up to 12 m provided with mini fingers. Fixed access gangways of m 6x1.20 and hinged gangway of m 6x1.20. Anchoring system with piles and sliding devices.
Private boats landings
2005 - Po delta (RO)
Private boats landings
2005 - Po delta (RO)
N 4 landings dimensions m 12x2.35 with deflecting wedges, hinged access gangways m 8x1,30, anchoring system with piles and sliding devices.
Public mooring pontoons
2005 - Darsena Sant'Elena, Venice (VE)
Public mooring pontoons
2005 - Darsena Sant'Elena, Venice (VE)
Moorings for public transport boats. Pontoons dimensions m 20x2.50 and 40x2.50 for a total of 500 m². Anchoring system with piles and sliding devices.
Floating platform for the spare time
2005 - Lake of EUR, Rome (RM)
Floating platform for the spare time
2005 - Lake of EUR, Rome (RM)
Surface about m² 520. Free board 80 cm, overload 400 kg/m². Anchoring system with quay hinges.
Inside protection of the harbour
2005 - Marsala (TP)
Inside protection of the harbour
2005 - Marsala (TP)
N 5 modules dimensions m 20x4 anchored with chains and deadweights giving protection to about 300 berths.
Sporting Club Marina
2005 - Chioggia (VE)
Sporting Club Marina
2005 - Chioggia (VE)
Floating structures with pontoons, catways, gangways protected by 12x3m floating breakwaters.
West Garda Marina
2005 - Padenghe sul Garda (BS)
West Garda Marina
2005 - Padenghe sul Garda (BS)
N 4 modules dimensions m 12x3, anchored with piles driven in the seabed giving protection to 80 berths. The breakwaters, equipped with fingers too, are used also for the mooring of boats up to 10 metres in length.
Shipyard protection
2005 - La Spezia (SP)
Shipyard protection
2005 - La Spezia (SP)
N 6 modules dimensions m 20x4, anchored with chains and deadweights giving protection to the shipyard. The breakwaters are used also for the mooring of boats up to 35 metres in length.
Marina Kastela
2005 - Kastell Gomilica, Split, Croatia
Marina Kastela
2005 - Kastell Gomilica, Split, Croatia
650 metres of floating pontoons.
Touristic harbour of Mitilene
2005 - Mitilene, isle of Lesbo, Greece
Touristic harbour of Mitilene
2005 - Mitilene, isle of Lesbo, Greece
300 metres of aluminium pontoons with fingers.
Marina of Novigrad
2005 - Novigrad, Croatia
Marina of Novigrad
2005 - Novigrad, Croatia
Floating infrastructures with pontoons, catways, gangways, anchoring and mooring system of the new marina.
Genoa Boat Show
Genoa exhibition area, Genoa (GE)
Genoa Boat Show
Genoa exhibition area, Genoa (GE)
Supply since 2005 of floating structures for the sea exibition area: 9400 square meters of floating piers up to 9m wide, slipways and floating platforms.
Touristic harbour
2004 - Lacco Ameno, Ischia (NA)
Touristic harbour
2004 - Lacco Ameno, Ischia (NA)
250 metres of discontinuous floating pontoons type "FE/IG/R", width 2.35 metres. Reinforced frame, free board 50 cm, overload 120 kg/m². Pontoons anchoring system with connecting rods and steel wire ropes and chains connected to deadweights. Boats mooring system with med moorings and deadweights.
Harbour slipway
2004 - Imperia (IM)
Harbour slipway
2004 - Imperia (IM)
N 4 slipways dimensions m 12x2.35 for the haulage and launching of boats during the Winter Regattas.
Private boats landing
2004 - Canal Grande, Venice (VE)
Private boats landing
2004 - Canal Grande, Venice (VE)
Landing dimensions m 5x3.00 for boats up to 15 metresw in length. Hinged access gangways m 4.60x1.25. Anchoring system with wood piles and devices.
Floating exhibition pavilion
2004 - Venetian Arsenal (VE)
Floating exhibition pavilion
2004 - Venetian Arsenal (VE)
Floating exhibition pavilion for the Biennial of Architectur. Main pavillion dimensions m 110x6 equipped with N 3 side platforms for a total surface of 250 m². Floatation units in rotomoulded polyethylene.
Boats floating warehouse
2004 - Trieste (TS)
Boats floating warehouse
2004 - Trieste (TS)
Surface about m² 180. Free board 25 cm, overload 100 kg/m². Anchoring system with vertical beams fixed to the quay.
Wood decking
2004 - Ceriale (SV)
Wood decking
2004 - Ceriale (SV)
Decking made of wood and aluminium prefabricated panels for a total surface of 750 m².
Mega-yacht pier
2004 - Bari (BA)
Mega-yacht pier
2004 - Bari (BA)
Floating pier dimensions m 80x4.15, free board 80 cm, overload 450 kg/m² for the mooring of boats up to 30 metres in length. Anchoring system with chains connected to concrete columns.
Touristic boats and taxi landings
2004 - Venice Terminal, Tronchetto (VE)
Touristic boats and taxi landings
2004 - Venice Terminal, Tronchetto (VE)
Floating pier dimensions m 160x4.63, free board 85 cm, overload 300 kg/m² for the landing of passengers from touristic boats and water-taxi up to 20 metres in length. Anchoring system with piles and sliding devices.
Shipyard protection
2004 - Giudecca Island, Venice (VE)
Shipyard protection
2004 - Giudecca Island, Venice (VE)
N 14 modules dimensions m 12x3, anchored with piles driven in the seabed giving protection to 80 berths. The breakwaters are used also for the mooring of boats up to 15 metres in length.
Marina Zea
2004 - Piraeus, Greece
Marina Zea
2004 - Piraeus, Greece
120 metres of pontoons with floating bridge and 80 metres of concrete pontoons.
Rowing pontoons
2004 - Algeria
Rowing pontoons
2004 - Algeria
Floating rowing pontoons for Arab sport games.
River port at Bosa
2004 - Bosa (OR)
River port at Bosa
2004 - Bosa (OR)
Floating harbour on the Temo river with floating pier dimensions m 180x4.70, free board 80 cm, overload 400 kg/m² for the protection of the floating harbour and for the mooring with fingers of boats up to 14 metres length. Floating platfom dimensions 20x19m. Anchoring system with piles and sliding devices. Full optional pump out station, aluminium frame structure with plexiglas shell, sewage suction terminal, oil suction terminal and oil tank.
Floating pontoons
2003 - Acitrezza, Ognina (CT)
Floating pontoons
2003 - Acitrezza, Ognina (CT)
200 metres of discontinuous floating pontoons type "FE/IG", width 2.35 metres. Free board 50 cm, overload 130 kg/m². Pontoons anchoring system and boats mooring system with chains, deadweights and med moorings.
Floating pontoons
2003 - Fezzano, Portovenere (SP)
Floating pontoons
2003 - Fezzano, Portovenere (SP)
275 metres of discontinuous floating pontoons type "FE/IG/R-H", width 2.35 metres. Reinforced frame, free board 70 cm, overload 240 kg/m². 80 metres of discontinuous floating pontoons type "FE/IG/R", width 2.35 metres. Reinforced frame, free board 50 cm, overload 120 kg/m². Pontoons anchoring system and boats mooring system with chains, deadweights and med moorings.
Floating pontoons
2003 - Le Grazie, Portovenere (SP)
Floating pontoons
2003 - Le Grazie, Portovenere (SP)
340 metres of discontinuous floating pontoons type, "FE/IG/R-H", width 2.35 metres. Reinforced frame, free board 70 cm, overload 240 kg/m². Pontoons anchoring system and boats mooring system with chains, deadweights and med moorings.
Rowing pontoons
2003 - Piana degli Albanesi (PA)
Rowing pontoons
2003 - Piana degli Albanesi (PA)
Rowing pontoon for boats launching, dimensions m 48x2.35, free board about 30 cm, with an access pontoon for the access of m 240x2.35, free board 50 cm. Anchoring system with piles and sliding devices.
Harbour slipway
2003 - Caorle (VE)
Harbour slipway
2003 - Caorle (VE)
Slipway dimensions m 16x5 for the haulage and launching of small boats.
Opening crossing
2003 - Muggia (TS)
Opening crossing
2003 - Muggia (TS)
The crossing connects the new service centre with the North quay. To allow the access to the basin the central bridge section can be opened electronically. The walkway, 51 metres in length and 2.60 metres wide, has an overload 400 kg/m². The opening central section creates a passage of about 6.50 metres wide.
Touristic boats landing
2003 - River Sile (TV)
Touristic boats landing
2003 - River Sile (TV)
N 1 landing m 12x4.63 for touristic boats up to 20 metres in length, equipped. Hinged access gangway of m 8x2.35. Anchoring system with piles and sliding devices.
Fire fighting department special pontoons
2003 - Kuwait City, Kuwait
Fire fighting department special pontoons
2003 - Kuwait City, Kuwait
Floating pontoon dimensions m 24x5 anchored with steel piles, used for the mooring of the Fire fighting dept. boats. Steel access gangway m 19x1.2.
Moorings at Terre Rosse
2003 - Piombino (LI)
Moorings at Terre Rosse
2003 - Piombino (LI)
Mooring infrastructures with floating pontoons, gangways, fixed quay and mini fingers in the Fosso Cagliana.
Sport Giricic
2003 - Kastell Gomilica, Split, Croatia
Sport Giricic
2003 - Kastell Gomilica, Split, Croatia
200 metres of aluminium floating pontoons.
ACI Piskera
2003 - Koronati National Park, Croatia
ACI Piskera
2003 - Koronati National Park, Croatia
105 metres of floating pontoons.
Olympic rowing-canoeing centre
2003 - Schinias, Marathon, Greece
Olympic rowing-canoeing centre
2003 - Schinias, Marathon, Greece
Olympic Games, Athens 2004 - Rowing-canoeing centre. 820 metres of rowing pontoonsFloating pontoons with free board lower than the standard one (16 or 24 cm) for launching and prize-giving, fingers free board 50 cm for the mooring of umpires boats and structures for race starting. Floating surface of 3.800 m².
Fire Fighting Departement
2003 - Kuwait City
Fire Fighting Departement
2003 - Kuwait City
Floating pontoon used for the mooring of the Fire fighting department boats.
Port of Taranto
2003 - Taranto (TA)
Port of Taranto
2003 - Taranto (TA)
Floating harbour with 24 modules dimensions m 12x3, anchored with chains and deadweights giving protection to 220 berths. The breakwaters are used also for the mooring of fishing boats up to 20 metres in length. Floating pier dimensions m 325x6.00, free board 75 cm, overload 240 kg/m² to allow the access to the mooring pontoons. Anchoring system with sloping beams hinged to the quay. N 1 platform m² 432 and No. 3 platforms m² 216. Free board 75 cm, overload 240 kg/m². Anchoring system with chains and deadweights.
Olympic sailing centre Agios Kosmas
2003 - Athens, Greece
Olympic sailing centre Agios Kosmas
2003 - Athens, Greece
10 slipways dimensions m 15x30 and 4 slipways dimensions m 15x15 used for the launching of boats during the saling races at Olympic Games in Athens 2004.
Porto Maurizio
2002 - Imperia (IM)
Porto Maurizio
2002 - Imperia (IM)
600 metres of discontinuous floating pontoons type "FE/IG/R", width 2.35 metres. Reinforced frame, free board 50 cm, overload 120 kg/m². Pontoons anchoring system and boats mooring system with chains, deadweights and med moorings.
Launching platform
2002 - Roma (RM)
Launching platform
2002 - Roma (RM)
Floating platform, m 20x5 and free board 20 cm, for the launching of the club members' rowing boats.
Marina slipway
2002 - Lignano Sabbiadoro (UD)
Marina slipway
2002 - Lignano Sabbiadoro (UD)
Slipway dimensions m 15x2.55 for the haulage and launching of small boats.
Floating marina
2002 - Portoferraio, Elba island (LI)
Floating marina
2002 - Portoferraio, Elba island (LI)
N 8 modules dimensions m 20x4, anchored with chains and deadweights giving protection to 60 berths. The breakwaters are used also for the mooring of boats up to 20 metres in length.
Port of Villa Bianca
2002 - Brissago, Switzerland
Port of Villa Bianca
2002 - Brissago, Switzerland
50 metres of pontoons with fingers.
Redentore Bridge
2002 - Venice (VE)
Redentore Bridge
2002 - Venice (VE)
Demountable modular floating crossing, to be installed annually on the recurrence of the fest of the Redentore, between "Zattere" and isle of Giudecca. Length 326m.
Ponte della Salute
2002 - Venice (VE)
Ponte della Salute
2002 - Venice (VE)
Demountable modular floating crossing, to be installed annually on the recurrence of the fest of Madonna della Salute, to connect the Canal Grande quays in front of La Salute church. Length 57m.
Service platform on the Tiber river
2002 - Rome (RM)
Service platform on the Tiber river
2002 - Rome (RM)
Surface about m² 450. Free board 70 cm, overload 660 kg/m². Anchoring system with rods. Wedge-shaped upstream side in order to deflect the shrubs. Downstream side with free board 20 cm and 100 kg/m² overload for launching of the rowing boats. Pre-arrangement for the superstructures installation.
Touristic harbour
2001 - Bisceglie (BT)
Touristic harbour
2001 - Bisceglie (BT)
300 of discontinuous floating pontoons type "FE/IG/R-H", width 2.35 metres. Reinforced frame, free board 70 cm, overload 240 kg/m². 270 metres of discontinuous floating pontoons type "FE/IG", width 2.35 metres. Free board 50 cm, overload 130 kg/m². Pontoons anchoring system and boats mooring system with chains, deadweights and med moorings.
Harbour slipway
2001 - Riva del Garda (TN)
Harbour slipway
2001 - Riva del Garda (TN)
Slipway dimensions m 15x5 for the haulage and launching of sailing school boats.
Floating walkway
2001 - The Historic Port of Genoa, Genoa (GE)
Floating walkway
2001 - The Historic Port of Genoa, Genoa (GE)
The crossing connects the quay with the head of the Molo Embriaco. Length 60 metres, width 2.4 metres and overload 400 kg/m².
Landing for cruiser tenders
2001 - La Spezia (SP)
Landing for cruiser tenders
2001 - La Spezia (SP)
Surface about m² 200. Free board 75 cm, overload 300 kg/m². Anchoring system with chains and deadweights. Positioning of prefabricated boxes to be used as offices and gazebo. Motorized access gangways, length 6 metres.
Wooden decking
2001 - Genoa (GE)
Wooden decking
2001 - Genoa (GE)
Decking made of wood and aluminium prefabricated panels for a total surface of 1370 m².
Olimpiakos
2001 - Athens, Greece
Olimpiakos
2001 - Athens, Greece
Rowing platform, dimensions m 12x5.
Port at Locarno
2001 - Maggiore lake, Locarno, Switzerland
Port at Locarno
2001 - Maggiore lake, Locarno, Switzerland
847m of floating pontoons, fingers and mini fingers.
Coastguard Headquarters
2001 - Al-Fintas, Kuwait
Coastguard Headquarters
2001 - Al-Fintas, Kuwait
Project, execution and installation of fixed gangway dimensions m 140x1,2, for the access to big boats berths (over 45 metres). Floating pier dimensions m 480x5, free board 50 cm, overload 150 kg/m² with fingers for the mooring of Speed Boats (displacement 9 tons). N 35 mooring piers for Patrol Boats (displacement 130 tons) dimensions m 35x5 each, free board 70 cm and overload 150.
Touristic landing
2000 - Sistiana (TS)
Touristic landing
2000 - Sistiana (TS)
300 metres of discontinuous floating pontons type "FE/IG", width 2.35 metres. Free board 50 cm, overload 130 kg/m². Pontoons anchoring system and boats mooring system with chains, deadweights and med moorings.
Pump out station
2000 - La Maddalena (OT)
Pump out station
2000 - La Maddalena (OT)
Full optional pump out station, aluminium frame structure with plexiglas shell, sewage suction terminal, oil suction terminal and oil tank.
Yacht Club Costa Serena
2000 - Palau (OT)
Yacht Club Costa Serena
2000 - Palau (OT)
Floating structures for vessels mooring in a luxury location in Nord Sardinia
Touristic boats landings
2000 - River Tevere (RM)
Touristic boats landings
2000 - River Tevere (RM)
N 4 landings dimensions m 11,50x2,50 with deflecting wedges, hinged access gangways m 8x1,40, anchoring sytem with rods and wire ropes.
Special pontoon for the birds migration control
2000 - Fondotoce (VB)
Special pontoon for the birds migration control
2000 - Fondotoce (VB)
Floating pontoon dimensions m 300x2.35 anchored with ropes and deadweights, provided with a net for the birds capture and control.
Protection of the touristic landing
2000 - Frikes, isle of Itaka, Greece
Protection of the touristic landing
2000 - Frikes, isle of Itaka, Greece
N 4 modules dimensions m 17.5x4, anchored with chains and deadweights giving protection to 40 berths. The breakwaters are used also for the mooring of boats up to 15 metres in length.
Marina da Doca de Alcantara
2000 - Lisbon, Portugal
Marina da Doca de Alcantara
2000 - Lisbon, Portugal
230 metres of floating pontoons with fingers.
Frikes touristic landing
2000 - Frikes, isle of Itaka, Greece
Frikes touristic landing
2000 - Frikes, isle of Itaka, Greece
80 metres of floating breakwaters, width 4.00 m.
Yasmine Marina
2000 - Hammamet, Tunisia
Yasmine Marina
2000 - Hammamet, Tunisia
1186m of floating pontoons and gangways into the two inner wet basins.
Lefkas Marina
2000 - Lefkada, Greece
Lefkas Marina
2000 - Lefkada, Greece
floating harbour with 616 metres of pontoons, 288 metres of floating breakwaters, width 3.00 m. Full optional pump out station, aluminium frame structure with plexiglas shell, sewage suction terminal, oil suction terminal and oil tank.
Floating pontoons
Trasimeno lake (PG)
Floating pontoons
Trasimeno lake (PG)
1999 - 32 metres of discontinuous floating pontoons typee "AL/ST" with aluminium frame, width 1.60 metres. Free board 50 cm, overload 130 kg/m². Pontoons anchoring system with steel piles and sliding devices. Boats mooring system with mini fingers.
2019 - Supply of additional aluminium floating pontoon and 2no. 4.5m long minifingers.
Private boats landing
1999 - River Po (RO)
Private boats landing
1999 - River Po (RO)
N 1 landing dimensions m 12x2.50 for boats up to 12 metres in length. Fixed access ganways m 8x1.30 and hinged gangway m 5x1.30. Anchoring system with piles and sliding devices.
Private boats landing
1999 - Po delta (RO)
Private boats landing
1999 - Po delta (RO)
N 1 landing dimensions m 38x4.93 with deflecting wedge for boats up to 12 metres in length. Fixed access ganways m 15x2.20 with stair and No. 2 hinged gangway of m 16x1.44 and m 14x1.44. Anchoring system with piles and sliding devices.
Venice - Chioggia Lagoon service landings
1999 - Isola dell'Unione, Chioggia (VE)
Venice - Chioggia Lagoon service landings
1999 - Isola dell'Unione, Chioggia (VE)
N 2 landings m 12x6 and N 1 landing m 12x9 for boats up to 30 metres in length. Landing wood covering, hinged access gangways m 5x1.20, anchoring system with piles and sliding devices.
Fiscardo touristic landing
1999 - Fiscardo, Cefalonia island, Greece
Fiscardo touristic landing
1999 - Fiscardo, Cefalonia island, Greece
60 metres of pontoons.
Electrodes-carrier pontoon
1999 - Nenuda, Igoumenitza, Greece
Electrodes-carrier pontoon
1999 - Nenuda, Igoumenitza, Greece
Electrodes-carrier pontoon for Pirelli Cavi S.p.A.
Pump out station
1998 - Porto Corallo (CA)
Pump out station
1998 - Porto Corallo (CA)
Pump out station, sewage and oil suction tank.
Floating walkway
1998 - Fosso Reale (LI)
Floating walkway
1998 - Fosso Reale (LI)
Realization of N 2 crossings, length 120 and 50 metres, width 4.70 metres and overload of 400 kg/m². The crossings can be opened by hand in the central part creating a passage of about 9 metres.
Sea-front pontoon
1998 - Quartu Sant'Elena (CA)
Sea-front pontoon
1998 - Quartu Sant'Elena (CA)
Fixed pontoon dimensions m 8x2.35, on steel piles.
Port of San Rocco
1998 - Muggia (TS)
Port of San Rocco
1998 - Muggia (TS)
Floating infrastructures with pontoons and gangways in the new marina.
Touristic harbour
1997 - Viareggio (LU)
Touristic harbour
1997 - Viareggio (LU)
420 metres of discontinuous floating pontoons type "FE/IG", width 2.35 metres. Free board 50 cm, overload 130 kg/m². Pontoons anchoring system and boats mooring system with chains, deadweights and med moorings.
Assonautica floating centre
1997 - La Spezia (SP)
Assonautica floating centre
1997 - La Spezia (SP)
Surface about m² 170. Free board 65 cm, overload 300 kg/m². Anchoring system with chains and deadweights. Positioning of prefabricated boxes to be used as offices, service and technical equipment for the port.
Floating solarium
1997 - Genoa (GE)
Floating solarium
1997 - Genoa (GE)
Surface about m² 180. Free board 75 cm, overload 400 kg/m². Anchoring system with chains and deadweights.
Fixed and floating pontoons
1997 - Savona (SV)
Fixed and floating pontoons
1997 - Savona (SV)
Fixed pontoon along side the quay, dimensions m 317x1.50 on steel brackets fixed to the quay and 312 m² of fixed platforms on piles. Floating piers.
Mega-yacht pier
1997 - The Historic Port of Genoa, Genoa (GE)
Mega-yacht pier
1997 - The Historic Port of Genoa, Genoa (GE)
Floating pier dimensions m 216x4.2, free board 80 cm, overload 400 kg/m² for the mooring of boats up to 40 metres in length. Anchoring system with vertical beams fixed to the quay and sliding devices.
Assonautica Provinciale la Spezia
1997 - La Spezia (SP)
Assonautica Provinciale la Spezia
1997 - La Spezia (SP)
Floating harbour with breakwaters: 11 modules dimensions m 20x4, N 5 modules dimensions m 20x3 and N 14 modules dimensions m 12x3 anchored with chains and deadweights giving protection to 590 berths, pontoons, service platforms and technological plants.
Floating marina
1997 - Fezzano, Portovenere (SP)
Floating marina
1997 - Fezzano, Portovenere (SP)
N 22 modules dimensions m 20x4, anchored with chains and deadweights giving protection to 260 berths. The breakwaters are used also for the mooring of boats up to 20 metres in length.
Marina of Fezzano
1997 - Portovenere (SP)
Marina of Fezzano
1997 - Portovenere (SP)
Floating harbour with breakwaters, pontoons, service platforms and technological plants.
Gouvia Marina
1997 - Gouvià, isle of Corfù, Greece
Gouvia Marina
1997 - Gouvià, isle of Corfù, Greece
Floating harbour with breakwaters and pontoons. N 14 modules dimensions m 12x3, anchored with chains and deadweights giving protection to 650 berths. The breakwaters are used also for the mooring of boats up to 24 metres in length.
Floating pontoons
1996 - Santa Margherita Ligure (GE)
Floating pontoons
1996 - Santa Margherita Ligure (GE)
300 metres of discontinuous floating pontoons type "FE/IG/R-H", width 2.35 metres. Reinforced pontoons, free board 70 cm, overload 240 kg/m². Pontoons anchoring system and boats mooring system with chains, deadweights and med moorings.
Pumping station
1996 - San Giovanni lake (AG)
Pumping station
1996 - San Giovanni lake (AG)
Pontoons dimensions m 280x3.60 with a platform with m 12.50x11.50 provided with N 8 electropumps of 480 litres/second and a 2.5 tons bridge crane. Depth variation 13 metres. Floatation units in coated galvanized steel filled up with expanded polyurethane.
F1 pontoon
1996 - Isle of Corfù, Greece
F1 pontoon
1996 - Isle of Corfù, Greece
100 metres of floating pontoons.
Port of Villasimius
1996 - Villasimius (CA)
Port of Villasimius
1996 - Villasimius (CA)
Floating infrastructures with floating pier dimensions m 57.5x5, free board 50 cm, overload 170 kg/m² for the separation of the port into two basins for the mooring of boats up to 20 metres in length. Anchoring system with chains and deadweights. Pump out station, sewage and oil suction tank.
Mooring piers
1995 - Porto San Lazzaro, Imperia (IM)
Mooring piers
1995 - Porto San Lazzaro, Imperia (IM)
300 metres of discontinuous floating pontoons type "FE/IG", width 2.35 metres. Free board 50 cm, overload 130 kg/m². Pontoons anchoring system and boats mooring system with chains, deadweights and med moorings.
Fixed pier
1995 - Cannigione, Arzachena (OT)
Fixed pier
1995 - Cannigione, Arzachena (OT)
Pontoons m 40x1.50 and platforms m 12x4.60 fixed on reinforced concrete bases.
Floating landing
1995 - Como (CO)
Floating landing
1995 - Como (CO)
Floating pier dimensions m 60x4.63, free board 55 cm, overload 240 kg/m² for the protection of the floating landing and for the mooring with finger of boats up to 10 metres in length. Anchoring system with chains and deadweights.
Touristic harbour
1994 - Alassio (SV)
Touristic harbour
1994 - Alassio (SV)
250 metres of discontinuouss floating pontoons type "FE/IG", width 2.35 metres. Free board 50 cm, overload 130 kg/m². Pontoons anchoring system and boats mooring system with chains, deadweights and med moorings.
Launching platform
1994 - Roma (RM)
Launching platform
1994 - Roma (RM)
Floating platform, m 20x5 and free board 20 cm, for the launching of the club members' rowing boats.
Floating barrier for the power station
1994 - Lake of Prati of Vizze (BZ)
Floating barrier for the power station
1994 - Lake of Prati of Vizze (BZ)
Pontoon dimensions m 26x2.40 with aluminium dam. Steel grid decking surface. Floation units in galvanized steel with different buoyancy.
Touristic harbour
1992 - Palau (OT)
Touristic harbour
1992 - Palau (OT)
380 metres of discontinuous floating pontoons type "FE/IG", width 2.35 metres. Free board 50 cm, overload 130 kg/m². Pontoons anchoring system with chains connected to deadweights. Boats mooring with fingers.
Floating bridge
1992 - La Maddalena (OT)
Floating bridge
1992 - La Maddalena (OT)
Car crossing 36 metres in length, 2 metres wide and 2 metres high in the central part. It is a "boat bridge" typology structure and connects the Isle of La Maddalena with the Isle of Chiesa.
Special pontoon for the refinery service boats
1992 - Isola dei Petroli, Porto Marghera, Venice (VE)
Special pontoon for the refinery service boats
1992 - Isola dei Petroli, Porto Marghera, Venice (VE)
N 2 floating pontoons dimensions m 3x4.65 with galvanized steel handrail. Fixed access gangway m 3.3x2 and hinged gangway m 6.5x1.20. Anchoring system with steel piles and sliding devices.
Floating landing
1992 - Oristano (OR)
Floating landing
1992 - Oristano (OR)
Floating pier dimensions m 120x4.63, free board 80 cm, overload 400 kg/m² . Anchoring system with chains and deadweights.
Palermo harbour
1992 - Palermo (PA)
Palermo harbour
1992 - Palermo (PA)
Floating pontoons for boat mooring completed with service bollards and fire fightings.
Floating landing
1991 - Maggiore lake, Ghiffa (VB)
Floating landing
1991 - Maggiore lake, Ghiffa (VB)
Floating pier dimensions m 160x4.63, free board 50 cm, overload 150 kg/m² for the protection of the floating landing and for the mooring with finger of boats up to 12 metres in length. Anchoring system with chains and deadweights.
Power Boat Monaco
1991 - Montecarlo, Monaco
Power Boat Monaco
1991 - Montecarlo, Monaco
150 metres of special floating pontoons and 100 m² of platform.
Equipments for the race ground
1990 - Naro lake (AG)
Equipments for the race ground
1990 - Naro lake (AG)
N 4 platforms m 24x4.60 with free board 20 cm for the haulage and launching of the athlets. Starting adjustable devices.
Touristic boats landings
1990 - Po delta (RO)
Touristic boats landings
1990 - Po delta (RO)
N 5 landings m 19x4.74 with deflecting wedge for boats up to 30 metres in length. Hinged access gangways m 8x1.00 with portal frame for gangway lifting, anchoring system with wood piles and guiding steel piles.
Boats landing pontoons
1990 - Palau (OT)
Boats landing pontoons
1990 - Palau (OT)
Shaped fixed pontoon, dimensions m 80x2.35 on steinless steel piles.
Adjustable landing on piles
1990 - Como lake, Lenno (CO)
Adjustable landing on piles
1990 - Como lake, Lenno (CO)
Boats landing up to 15 metres in length, adjustable height on piles. Dimensions m 13.5x1.50.
Bathing platform
1989 - Lake of Ledro (TN)
Bathing platform
1989 - Lake of Ledro (TN)
Total surface about m² 100. Free board 50 cm, overload 120 kg/m². Anchoring system with chains and deadweights.
Fixed pontoons and fingers
1989 - Viverone lake, Piverone (TO)
Fixed pontoons and fingers
1989 - Viverone lake, Piverone (TO)
Fixed pontoons and fingers on wood piles for the mooring of boats up to 10 metres in length.
Pumping station
1988 - Castello lake (AG)
Pumping station
1988 - Castello lake (AG)
Pontoon dimensions m 240x2.40 with N 2 platforms dimensions m 4.50x4.50 included N 6 electropumps of 300 litres/second. Depth variation 18 metres. Floatation units in coated galvanized steel filled up with expanded polyurethane.
Service platforms for the touristic harbour
1988 - Trani (BT)
Service platforms for the touristic harbour
1988 - Trani (BT)
Total surface about m² 300. Free board 75 cm, overload 400 kg/m². Anchoring system with chains and deadweights. Positioning of superstructures.
Equipments for the race ground
1987 - The Idroscalo, Milan (MI)
Equipments for the race ground
1987 - The Idroscalo, Milan (MI)
Floating pontoons with free board lower than the standard one (16 or 24 cm) for the boats launching, platform for the prize-having free board 50 cm and structures for race starting.
Pumping station
1987 - Leone lake (AG)
Pumping station
1987 - Leone lake (AG)
Pontoon dimensions m 70x3.20 ith N 2 platforms dimensions m 6x3.50 included N 3 electropumps of 200 litres/second. Depth variation 13 metres. Floatation units in coated galvanized steel filled up with expanded polyurethane.
Floating restaurant
1987 - Santa Margherita Ligure (GE)
Floating restaurant
1987 - Santa Margherita Ligure (GE)
Surface about m² 40. Free board 75 cm, overload 400 kg/m². Furnishing pre-arrangement. Anchoring system with chains and deadweights.
Floating teather and exhibition platform
1987 - Viareggio (LU)
Floating teather and exhibition platform
1987 - Viareggio (LU)
N 1 platform about 150 m² and No. 1 platform about 200 m². Free board 50 cm. Anchoring system with chains and deadweights.
Touristic harbour
1986 - Marina Piccola, Cagliari (CA)
Touristic harbour
1986 - Marina Piccola, Cagliari (CA)
500 metress of discontinuous floating pontoons type "FE/IG", width 2.35 metres. Free board 50 cm, overload 130 kg/m². Pontoons anchoring system and boats mooring system with chains, deadweights and med moorings.
Pontoon along side the quay
1983 - Como lake, Lierna (LC)
Pontoon along side the quay
1983 - Como lake, Lierna (LC)
Fixed pontoon along side the quay, dimensions m 50x2.35, for the mooring of boats up to 10 m in length, on steel piles.
Pontoons for the National Rowing-Centre
1982 - Piediluco lake (TR)
Pontoons for the National Rowing-Centre
1982 - Piediluco lake (TR)
N 4 platforms m 25x4.50 with free board 18 cm for launching.
Flaoting stage
1981 - The Idroscalo, Milan (MI)
Flaoting stage
1981 - The Idroscalo, Milan (MI)
Surface about m² 250. Free board 70 cm, overload 400 kg/m². Provided with service platform with lower free board. Anchoring system with chains and deadweights.
Electrodes-carrier pontoon
1980 - Punta Tramontana, Castelsardo (SS)
Electrodes-carrier pontoon
1980 - Punta Tramontana, Castelsardo (SS)
Pontoon dimensions m 40x2.10 included N 30 electrodes bearing devices, with 220KV direct current. Electrodes and electricity lines covering in fibreglass. Floatation units in fibreglass filled up with expanded polystyrene.
test
1234 - test (BZ)
test
1234 - test (BZ)
test